Quality inspection workstation checking a silicone component
QUALITY
OEM / ODM
01 / ESKY SUPPLY

Quality Control

Quality checks for custom silicone products, molded components, multi-material assemblies and packaged goods — from sample confirmation through production and final shipment inspection. Inspection points are defined according to the approved sample, drawings, specifications and confirmed project requirements.

QC ACROSS THE PROJECT

Quality Control Across the Project

011

Incoming Material / Component Check

Review incoming silicone materials, plastic or metal components, hardware and packaging items where required.

022

Sample Confirmation

Check dimensions, appearance, color, hardness, fit and function against the confirmed project requirements.

033

In-Process Inspection

Monitor critical product characteristics during molding, trimming, assembly or production.

044

Assembly Inspection

Check component matching, fit, orientation, hardware installation and product completion.

055

Packaging Inspection

Check labels, accessories, quantity, packaging condition and set completeness.

066

Final Pre-Shipment Inspection

Review finished products against the approved sample and confirmed shipment requirements before release.

INSPECTION REFERENCE

What We Inspect Against

Inspection criteria should be agreed during product development and sampling so that production and final inspection use the same confirmed reference.

011

Approved Sample

The approved sample is the primary reference.

022

2D Drawing

Drawings with key dimensions and requirements.

033

3D / CAD Requirement

CAD data used for geometry confirmation.

044

Confirmed Dimensions

Dimensions agreed during development and sampling.

055

Pantone / Color Reference

Confirmed color references for comparison.

066

Material / Hardness Requirement

Material and hardness per specification.

077

Assembly Specification

Assembly scope and sequence per project.

088

Packaging Requirement

Packaging format and set definition.

099

Customer-Specific Quality Points

Customer-defined checkpoints added to the plan.

PRODUCT CHECKS

Typical Product Quality Checks

011

Dimensions

Checked against the confirmed dimensions.

022

Silicone Hardness

Hardness confirmed against the specification.

033

Color Consistency

Color compared against the approved reference.

044

Surface Finish

Surface quality consistent with the approved sample.

055

Flash

Flash kept within the agreed allowance.

066

Parting Line

Parting line finished per agreed surfaces.

077

Logo / Detail Clarity

Molded details and logos remain legible.

088

Product Function

Function checked against the requirement.

099

Fit / Interface

Fit confirmed against mating parts.

1010

Visual Condition

Visual condition reviewed before release.

MULTI-MATERIAL & ASSEMBLY

Multi-Material & Assembly Checks

Multi-material products require both individual component checks and final assembled-product confirmation.

011

Plastic / Metal Insert Position

Inserts positioned as designed.

022

Overmold Coverage

Coverage matches the confirmed geometry.

033

Interface Fit

Interfaces fit as approved on samples.

044

Retention / Connection

Connections hold as designed.

055

Assembly Orientation

Parts oriented correctly at assembly.

066

Hardware Position

Hardware positioned per the design.

077

Strap / Textile Installation

Straps and textile installed per the design.

088

Functional Check

Assembled products checked for function.

PACKAGING & KITS

Packaging & Kit Inspection

011

Correct Product

Products match the confirmed list.

022

Correct SKU

SKU matches the order.

033

Correct Quantity

Quantities verified per set.

044

Correct Accessories

Accessories included per the set definition.

055

Labels / Barcodes

Labels and barcodes applied per requirement.

066

Instruction Cards

Cards included where required.

077

Gift / Retail Packaging Condition

Packaging clean and intact.

088

Outer Carton Marking

Carton marking per shipment requirement.

099

Set Completeness

Sets complete per the confirmed list.

1010

Shipping Protection

Products protected for shipment.

COLOR & APPEARANCE

Color, Surface & Appearance Control

Appearance requirements should be confirmed during sampling before repeat production begins.

011

Pantone Reference

Confirmed references used for comparison.

022

Color Comparison

Color compared against the approved reference.

033

Surface Texture

Texture matches the confirmed sample.

044

Matte / Gloss Finish

Finish reviewed against the approved sample.

055

Molded Logo

Logos checked for clarity and placement.

066

Printed Detail

Printed details checked per requirement.

077

Visual Defects

Visual defects reviewed against agreed criteria.

088

Surface Cleanliness

Surfaces checked clean before packing.

DIMENSIONS & FIT

Dimensions, Fit & Functional Confirmation

Critical dimensions and fit points depend on the product and should be confirmed before tooling and sample approval.

011

Critical Dimensions

Key dimensions checked per drawing.

022

Tolerance Points

Tolerances agreed during development.

033

Product Fit

Fit confirmed against mating parts.

044

Assembly Interface

Interfaces checked at assembly.

055

Seal / Contact Area

Sealing and contact areas checked.

066

Grip / Soft-Touch Area

Grip areas checked for feel.

077

Functional Movement

Moving parts checked for function.

088

Accessory Compatibility

Accessories fit as intended.

REPEAT PRODUCTION

Repeat Production Control

Approved samples and confirmed specifications are used as the reference for future OEM/ODM production runs. Repeat production is reviewed against the same confirmed reference used for the approved project.

011

Material / Component Consistency

Materials and components consistent across runs.

022

Color Consistency

Color compared against the approved reference.

033

Dimensions

Dimensions checked against the confirmed drawing.

044

Surface Finish

Surface finish consistent with the approved sample.

055

Assembly Method

Assembly follows the confirmed sequence.

066

Packaging Configuration

Packaging matches the confirmed format.

077

Final Product Appearance

Final appearance reviewed before release.

ISSUE HANDLING

When an Issue Is Found

Project-specific follow-up is based on the confirmed product and quality requirements.

011

Identify the Issue

The issue is identified and described clearly.

022

Separate Affected Products

Affected products are separated from the run.

033

Confirm Requirement / Reference

The requirement is confirmed against the approved reference.

044

Review Cause

The cause is reviewed with the relevant process step.

055

Correct / Rework Where Appropriate

Rework or correction is applied where appropriate.

066

Re-Inspect

Corrected products are re-inspected against the same criteria.

BY PROJECT TYPE

Quality Control for Different Project Types

Inspection emphasis adapted to each project type.

011

Custom Silicone Consumer Products

Checks for finished consumer products and sets.

022

Accessories & Components

Fit and function checks around existing products.

033

Branded Merchandise & Gift Sets

Appearance, labeling and set completeness.

044

Industrial & Technical Parts

Dimensions, tolerance and function checks.

055

Multi-Material Products

Component, interface and assembly checks.

066

Repeat OEM / ODM Programs

Repeat consistency against approved references.

FAQS

Quality Control FAQs

SEND YOUR RFQ

Send Your RFQ

Share your drawing, approved sample requirements, inspection points or project specifications. Tell us about the product, market and quality expectations.

Project Contact
info@eskysupply.com
Phone number
+86-13530555419
Location
4th floor, No.396 JinGang Ave. JinDong,Jinhua, ZheJiang,China
Working hours
Mon-Fri 24 hours

PROJECT INTAKE

Send Your RFQ

Share your inspection points and specifications so we can review the quality-control plan.

0/120
0/300
0/300
0/1200